50Hertz is one of the four transmission system operators (TSO) in Germany. We transport electricity at extra-high voltage level. The company's approximately 1,600 employees achieve something that until recently seemed impossible: advancing the energy transition at high speed while maintaining a high level of supply security. Together with the Belgian electricity grid operator Elia (Brussels), we form the internationally active Elia Group. As a TSO, we take on a central moderating role in the realisation of the energy transition from a social, technical and economic perspective.

Bauingenieurin Anlagen / Gebäude für Offshore Stromnetz (w/m/d)
50Hertz Transmission GmbH – ein Unternehmen der europäischen Elia Group • Güstrow • No time limit • Experienced professionals
-
Vollzeit (37 Stunden pro Woche)
Güstrow
Stellen-ID: 3262
50Hertz Transmission GmbH - a company of the European Elia Group
My new place of work
Güstrow - Rostocker Chaussee 18, 18273 Güstrow
What are the benefits of working for 50Hertz?
37 hour week
Company pension
30 days of holiday
Flexitime with a long-term time account
Fair remuneration and a wide range of social benefits
Supported personal development
A job with a future

Whether you work on a platform, on substations, or in the office, if you want to work actively to combat climate change, you will find that the offshore division provides opportunities for meaningful work. The jobs available range from technical and engineering duties to administration and support services.
Testimonials




Videos

As one of the four transmission grid operators in Germany, 50Hertz is responsible for high-voltage power transmission; control at this level is decisive for the stability of the grid and to ensure a secure electricity supply in Germany and Europe. We are part of a European grid association, working closely with colleagues throughout Europe. 50Hertz is part of a European company, working alongside Belgian grid operator Elia in the Elia Group. We work together closely in many key areas. Individual activities such as IT or purchasing are organised at the group level, which means that in these areas colleagues from Elia and 50Hertz work in a team from both Berlin and Brussels.

Asset Management: This involves developing the principles and guidelines required to handle the construction-related challenges that arise throughout the organisation.
Projects, cables, substations, and offshore: These divisions carry out all renovation and new build projects in our main areas of construction such as overhead power lines and cable traverses, substations, and switchgear, as well as offshore construction.
Grid operation: Here the status of our installations and structures is monitored, necessary actions are identified, and maintenance projects are initiated and implemented.

Isabell Nowak
Send email E-Mail copied! Copy E-Mail?
Please do not hesitate to apply, even if you do not match the competence profile 1:1 in all points.
We welcome applications from people with disabilities. The 50Hertz Disabled Persons Representative (SBV) (sbv@50hertz.com) will be glad to advise you confidentially, including on the accessibility of our workplaces. If you would like to mention your (severe) disability already in the application form and/or your application, we will forward your application to the SBV so that they can actively support your application from the beginning.